TR measurement
TR measurement is the established way in Finnish construction to carry out the statutory weekly maintenance inspection and measure a site’s safety level. In FiSAS the measurement is done on mobile: each topic area is tapped as correct or incorrect, and incorrect marks open an observation form with photos and floor-plan positioning. The TR index is calculated automatically.
Try for freeThe weekly site safety round on mobile, a tappable TR form with observations on the floor plan.
- Tappable form for all 7 official TR categories
- An incorrect observation automatically opens a description and photo form
- The location is marked directly on the project's floor plan
- The TR index is calculated in real time
- Email notification to the responsible person about observations to fix
- PDF report with one click

THE ROUND ON YOUR PHONE
MEASUREMENT FORM
Every topic area is its own card where you record observations with a correct or incorrect button. The counters keep track of the marks and the TR index updates at the top of the form right away. An incorrect mark creates an observation with its own description, a missing helmet for example, so the measurement is finished at the end of the round with nothing to type up afterwards.

THE SITUATION AT A GLANCE
SUMMARY
The summary gathers the open observations, the overdue fixes and how the TR index has developed. The category bars show where problems keep recurring, so you can see what to address before the next round.

Try TR measurement for free
14 days free, no payment details, no commitment.
Frequently asked questions
Which plan includes TR measurement?
TR measurement is part of the Master plan.
Which categories are in the TR measurement?
FiSAS TR measurement includes all 7 official categories: Working, Scaffolding and walkways, Machines and equipment, Fall protection, Electricity and lighting, Order and waste management, and Dust and chemicals.
How do observations appear on the floor plan?
Incorrect observations can be positioned on the project's floor plan. They appear as category icons, colour-coded by the status of the fix.
Can the TR report be attached to the final report?
Yes. TR measurements can be included in the project's final report as a PDF.
Other features
Cost estimation
AI drafts the quote from your drawings for you. You review it, price it with your own rates and win more contracts.
Drawing measurement
AI takes off the quantities from your drawings for you. You review them, and they go straight into the quote.
Invoicing
Invoice your projects fast. The invoice is created straight from logged work or by payment instalments.